In this semester the integrator proyect consists the chemicals reactions they are oxidation and reduction and consists in make a pail electrolytic that generate a some voltage, but as this pail generate a voltage very low and we need cover a voltaje mínimum the 15v and for can this objetive is needed make or buil a battery in witch is installed a strip the pails electrolytic that generate a 1.5v and so to cover the share defined as mínimum because as they have a definite life time the preference have and keep a voltage highest of the 15v and keep for a time ans so can calculate the life time of the our battery.To do this is pretend usin home materials and so skip using the materials most pollutants for the enviroment.
Monday, June 1, 2015
Tuesday, February 17, 2015
First Proyect Report! Second Partial.
Proyect Report!
Project organization.
The leader
of distributed team work, which each of my colleagues investigated on questions
assigned to each subject, my I touch me investigate the chemistry and
electricity and magnetism and finally together research to complement the
document.
Finally my
team and I work very well and eventually studied on each subject, I also
learned a lot about the electrochemical battery, in short for our project, the
battery we have to do is to generate 15 volts.
To do this
is pretend using home materials and so skip using the materials most pollutants
for the enviroment.
Saturday, November 22, 2014
IP Conclusions!
In conclusion, i learned many things about the project, with the programming we will easily handle our mechanism of two links and with regarding the courses electronic facilitated us to make the circuit for parallel port cable, the team was very happy and satisfied with the results that we obtained. and most of all because my team is avansando lot especially because are few days.
also each of my companions had different activities to do, the leader of my team knows organize.
Finally, and finally we have to make our project work 100%. until this moment I am satisfied with the results we have obtained in the different points required for the presentation of the project integrator, so far, we have achieved as a team what has been agreed for the construction of our project.
Wednesday, November 19, 2014
Parts, functions and locations!

FUEL GAUGE:
The fuel gauge, can can be found on a digital display behind the steering wheel, and indicates the fuel available.
FUEL TANK:
The fuel tank used to move the vehicle, the fuel tank is to the right of the left wheel.
BRAKE:
The brake is an important part of the wheels, this device can stop the car in an emergency and for daily use. It placed to the left of ring in the wheel.
SILENCER:
Is the final part of all the exhaust pipe, the silencer is below the rear bumper.
EXHAUST PIPE:
Is the pipe that connects the pipeline with the silencer under the car, where the smoke get out. the exhaust pipe is under the car, to the right of the wheels.
PIPELINE:
The pipeline of the car is a tube, where all the smoke of the burned fuel produced in the engine get out of the car. It begin under the engine and goes to tail of the car and ends with a silencer.
DRIVE SHAFTS:
The drive shaft is placed in middle of the wheels and it is add to a part of the engine; a rotating shaft that transmits mechanical power from a motor or an engine to a specific point.
ENGINE:
The engine is the important thing of any car because without it, the car not turn . the engine is in front of the car, in the center of the coffer.
Wednesday, October 22, 2014
Proyect Report!
Project organization.
To begin working with our project buy the material to make the links in this case decided they were aluminum, the team mate Luis Fernando of team 3 commissioned to find a place to buy an aluminum bar for the three teams.
Purchased the aluminum bar we had to cut and deal in equal to 3 teams parts, so we had to work in the machine shop for the aluminium bars, and I touched my cut because he facilitated me more than my other classmates.
And all the time not spent working in the machine shop because some of my colleagues could not gather elsewhere.
Integrated Project.
For our links aluminum had 2 meters of aluminium, so we decided to split them in 8 bars 20 cm long, 4-bar deal for a link and 4 for the other, the remachamos and finally put the sand it and polish it. Our base is a 40x40 piece of wood was painted white and with decorations that put my partner Jorge, and built and put together of our mechanism in the base, we managed because we had some problems with the nuts because loosened. And finally we need what our circuits to operate at 100% our mechanism two links.
Friday, October 17, 2014
Wednesday, October 1, 2014
"Skateboard Set Up"
Material of skateboard.
Hardware
Bearing
Truck
Wheel
Riser
Deck
Griptape
Step 1: Installing Skateboard Truck Hardware
If you haven’t done so already, pop through the screw holes in your skateboard deck. There should be eight holes total. Insert a screw into each hole.
Step 2: Attaching the Skateboard Trucks
With the large bolt (kingpin) facing the center of the deck, attach the skateboard trucks to the screws. Tighten the bolts using a screwdriver or skate tool.
Step 3: Inserting the Bearing in the Skateboard Wheels
Carefully remove the nut and two washers from the truck axle. Put them aside. Insert the bearings into each wheel by first placing the bearing on the truck axle with the metal side down. Put the wheel onto the axle and press to insert the bearing. Repeat on both sides for each wheel.
Step 4: Installing the Skateboard Wheels on the Trucks
To attach the wheels, place one of the washers onto the truck first followed the complete wheel and the second washer. Use a skate tool to secure the wheel with a nut. Repeat for the other three wheels.